Nobody calls to tell you a job is stuck. The homeowner assumes you are busy, the crew assumes the office has it, and the office assumes the crew is waiting on the weather. A week goes by. Then the homeowner calls, and the first thing you have to admit is that you do not know where their job is.

The jobs that go quiet are rarely the ones with a big problem. They are the ones where a small thing was never done: nobody ordered the material, nobody wrote the work order, nobody took the photos. Each one looks fine from where any single person sits. The pattern only shows when somebody looks at all the open jobs at once and asks which of them have not moved.

What "Stuck" Means in Software Terms

BetterRoofingPro moves every job through a set of stages: Lead, Confirm Appointment, Estimate, Claim Submitted, Follow Up, Job Awarded, Order Material, Work Order, Installation and Complete. The Program Health view of each program looks at every job in that program that is not yet Complete and asks one set of questions about each of them. It gives a job a reason for being at risk, and often more than one.

Overdue in stage. Every stage has an allowed length of time, and a job that has sat in its current stage longer than that is flagged, with the days it has been there shown next to the allowance. Time in stage is counted from the most recent status change recorded in the job's history. A job with no recorded status change falls back to the date it was last edited, and then to the date it was created, so its age is approximate.

No photos on file. Once a job is awarded, and through material ordering, the work order and installation, it should have photographs attached. A job in any of those stages with none is flagged.

No work order created. A job that has reached the Work Order or Installation stage with no work order attached is flagged. That is the job that was moved forward on the board while the paperwork stayed behind.

Materials not yet delivered. A job in the Order Material stage that has a work order, where no work order has been marked as having its materials delivered, is flagged.

A job that is Complete is never flagged, however long it took to get there.

See Program Health on Your Own Jobs

Bring a list of what is open today and watch which jobs Program Health says have stopped moving, and why.

Request a Demo Start Free Trial

Why the Reasons Matter More Than the Count

A bare number of "at risk" jobs is easy to ignore. A list that says what is wrong with each one is a to-do list. Each flagged job shows its address (or the customer's name when no address is on file), its stage, how long it has been in that stage and the reason or reasons it was flagged. The list is ordered with the jobs that have the most reasons first, and among those, the ones that have waited longest.

That ordering reflects how stuck jobs behave. A job that is overdue, has no photos and has no work order is not unlucky. It was dropped. A job that is only a little over its allowance in one stage may just be waiting on a callback. The first kind needs a call this morning. The second can wait for the afternoon.

On a program's Program Health view, the at-risk count covers every at-risk job in that program. The list beneath it shows the worst 50 rather than all of them, so a program with a long backlog should read the count as the size of the problem and the list as where to begin.

The Same Rules Everywhere You Look

The at-risk count is program by program: open a program and its Program Health section shows that program's count and list. Every program is built on the same rules, so two programs are counting the same thing. That sounds minor until two managers disagree about how many jobs are in trouble and one of them is looking at a different definition. The company-wide Portfolio screen has no at-risk list of its own: each program card there carries that program's at-risk count, built on the same rules.

Alongside the at-risk list, once a program has work in the production stages, Program Health also shows a materials-ready measure: the share of work orders on jobs in the production stages whose materials have been delivered. The product also calculates a start-date measure at company scope, but it does not appear in the screens described here. It counts scheduled work orders from earlier in the current week or month, not distinct jobs, and treats a work order as on time when its actual start falls within 24 hours either side of the scheduled start. Neither measure is a verdict. They are the questions to ask when the at-risk list keeps growing: is material the reason, or is the schedule slipping on its own?

What It Cannot Tell You

This is a set of rules about records, not a view of the roof. Read the flags with that in mind.

It only knows what someone entered. If a crew lead drags a job to Installation without creating a work order, the job is flagged. If the work order exists but nobody marked the materials delivered, the job looks short of material when the pallets may be sitting in the yard. Program Health is as honest as the people updating the board.

A photo count is not a photo review. A job with one blurry picture of a driveway counts as having photos. The flag tells you the folder is empty. It cannot tell you the folder is any good. If you want photos to mean something, a stage checklist that requires them with a named person behind each one is the stronger control, which is the subject of a separate post.

Some stuck jobs are waiting for good reasons. A claim waiting on an insurer, or a homeowner who asked for a pause, will age past its allowance and be flagged. The flag is a prompt to check and to note what you learned in the job, not a finding of fault.

The allowed time per stage is the product's, not yours. In the current version the allowance for each stage is set in the software, and a company does not edit it. Treat it as a yardstick that is the same for everyone rather than a promise about how long your kind of work should take.

Turn It Into a Morning Habit

Open each program's Program Health at the start of the day, before the phones start. Take the flagged job at the top, find out who owns the missing piece and ask for it by the end of the day. Write what you learn on the job so the next person does not repeat the call. Then go down the list until the reasons stop being yours to fix.

After a few weeks the list tells you something about your company, not just your jobs. If most flags are missing work orders, the handoff from sales to production is where work gets dropped. If most are materials, the ordering step is. If most are photos, the crews are not treating documentation as part of the job. You can fix a process once you can see which one it is.

Find the Quiet Jobs Before the Homeowner Does

BetterRoofingPro flags open jobs that have overstayed their stage or are missing photos, a work order or delivered materials, and says why. Schedule a demo or start free today.

Request a Demo Start Free Trial